Skip to content

Our Work

Products we have designed, built and launched

A selection of the 725+ projects we have delivered, from fitness platforms to enterprise systems, and what our clients said about working with us.

5.0 on Clutch · 27 verified reviews (opens in a new tab)

Our work

Products we have brought to life.

From fitness and travel apps to eCommerce and healthcare platforms, here are a few of the products our team has designed, built and launched for clients.

View All Projects
What we built
Industry

  1. Trading Desk Platform
    • Fintech
    • Web
    • Real-time

    Trading Desk Platform

    Engagement length
    3+ years, ongoing
    Platform
    Web application

    Live positions, controlled order entry and a complete audit trail for a trading firm, designed for speed of reading under pressure.

    • 75%Faster end-of-day reconciliation
    • 90%Reduction in order entry errors
    • 100%Of actions traceable to a person and a moment

    Overall, their team has completely met our expectations.

    Director, Trading Firm
    View case study: Trading Desk Platform
  2. Freight Dispatch Platform
    • Logistics
    • Web & Mobile
    • Offline-first

    Freight Dispatch Platform

    Industry
    Logistics & supply chain
    Platform
    Web console · Android app

    A dispatch console and a driver app on one job record, with proof of delivery captured at the door and status the customer can trust.

    • 80%Fewer status calls to the office
    • 35%More deliveries per driver per day
    • 90%Faster proof of delivery
    View case study: Freight Dispatch Platform
  3. Lettings Management Platform
    • Real Estate
    • Web
    • Portals

    Lettings Management Platform

    Industry
    Real estate & property management
    Platform
    Web · landlord & tenant portals

    Viewings, tenancies, maintenance and rent as records with an owner and a history, instead of threads in somebody's inbox.

    • 75%Faster maintenance resolution
    • 60%Fewer inbound emails to the agency
    • 40%Reduction in rent arrears
    View case study: Lettings Management Platform
  4. Wholesale
    • Web portal
    • ERP integration

    B2B Ordering Portal Connected to the ERP

    Industry
    Manufacturing & wholesale
    Timeline
    12–18 weeks

    A trade portal with customer-specific prices, quick reorder, tracking and invoices, live from the ERP.

    • 30–60%Of orders placed online
    • Fewer'Where is my order?' calls
    • ZeroRetyped web orders
    View case study: B2B Ordering Portal Connected to the ERP
  5. Healthcare
    • Web app
    • Booking

    Online Booking for a Clinic Group

    Industry
    Healthcare
    Timeline
    10–16 weeks

    Online booking with live practice system availability, deposits and reminders for a clinic group.

    • 30–50%Of bookings made online
    • 15–30%Fewer no-shows with deposits
    • LiveAvailability
    View case study: Online Booking for a Clinic Group
  6. Training
    • Web app
    • LMS

    Customer and Partner Training Portal

    Industry
    Corporate training
    Timeline
    12–16 weeks

    Courses, assessments and certificates for customers and partners, with training status in the CRM.

    • 10–25%Fewer 'how do I' support tickets
    • TrackedPartner certifications
    • FasterCustomer onboarding
    View case study: Customer and Partner Training Portal
  7. Marketplace
    • Marketplace
    • Payments

    Local Services Marketplace

    Industry
    Marketplaces
    Timeline
    16–24 weeks

    A two-sided platform with provider verification, booking, split payments, reviews and operations tools.

    • TrackedSearch-to-booking conversion
    • VerifiedEvery provider
    • AutomaticSplit payments and payouts
    View case study: Local Services Marketplace
  8. Public Sector
    • Modernisation
    • Web app

    Legacy Access and VB6 Modernisation

    Industry
    Public sector
    Timeline
    12–24 weeks

    A critical Access or VB6 system rebuilt as a secure web app, with its business rules preserved and tested.

    • DocumentedBusiness rules
    • SecureAccess and audit
    • AnywhereAccess for users
    View case study: Legacy Access and VB6 Modernisation
  9. Construction
    • PWA
    • Compliance

    Site Inspection and Compliance App

    Industry
    Construction
    Timeline
    10–16 weeks

    Offline site inspections with photos, assigned corrective actions and subcontractor snagging.

    • TrackedEvery corrective action
    • FasterSnag close-out
    • On demandCompliance reports
    View case study: Site Inspection and Compliance App
  10. Real Estate
    • Web portal
    • CMS

    Property Listings and Enquiry Portal

    Industry
    Real estate
    Timeline
    10–14 weeks

    Live unit availability, floor plans, virtual tours and enquiries straight into the CRM for a developer.

    • LiveUnit availability
    • MinutesEnquiry to CRM
    • MoreQualified enquiries
    View case study: Property Listings and Enquiry Portal
  11. Lending
    • Web portal
    • Fintech

    Digital Loan Origination Portal

    Industry
    Lending
    Timeline
    16–24 weeks

    Online applications, document upload, automated checks and an underwriting workflow with a full audit trail.

    • 30–60%Faster time to decision
    • HigherApplication completion rate
    • CompleteAudit trail
    View case study: Digital Loan Origination Portal
  12. Travel
    • Web app
    • Travel

    Itinerary Builder for Tailor-Made Travel

    Industry
    Travel
    Timeline
    14–20 weeks

    Trips assembled from a supplier library, costed accurately and delivered as branded proposals.

    • 50–70%Less time building proposals
    • AccurateTrip costing
    • BrandedEvery proposal
    View case study: Itinerary Builder for Tailor-Made Travel
  13. Non-profit
    • Web platform
    • Donations

    Volunteer and Donation Platform

    Industry
    Non-profit
    Timeline
    12–18 weeks

    Volunteer sign-up and shifts, online giving and one supporter account, connected to the charity's CRM.

    • 40–60%Less volunteer admin
    • OwnedSupporter data
    • EasierRegular giving
    View case study: Volunteer and Donation Platform
  14. Medical
    • Healthcare
    • Web
    • SaaS

    Dental Practice Management Platform

    Industry
    Healthcare — dental
    Platform
    Cloud web application

    A secure, cloud-based dental practice management platform with accurate tracking and an interface the whole clinic can use.

    • 65%Less administrative time per day
    • 40%Fewer missed appointments
    • 3xFaster patient check-in
    View case study: Dental Practice Management Platform
  15. Online Tutoring Platform
    • Education
    • Web & Mobile
    • Live video

    Online Tutoring Platform

    Industry
    Education & e-learning
    Platform
    Web · iOS · Android

    Live lessons with shared materials, scheduling across time zones, and progress reports a parent can actually read.

    • 70%Increase in lesson attendance
    • 55%More subscription renewals
    • 50%Less administrative time for tutors
    View case study: Online Tutoring Platform
  16. Creator Community Platform
    • Media & Social
    • Web & Mobile
    • Subscriptions

    Creator Community Platform

    Industry
    Media, social & creator economy
    Platform
    Web · iOS · Android

    Paid membership tiers, video and audio that play instantly, and a community with the moderation tools built before they were needed.

    • 3.2xGrowth in paying subscribers
    • 65%Improvement in member retention
    • 50%Faster video start times
    View case study: Creator Community Platform
  17. Web-Based HRM System
    • HR Software
    • Web
    • SaaS

    Web-Based HRM System

    Engagement length
    2 years
    Platform
    Web application

    A web-based HR management system configured per organisation, with employee data isolated and every access recorded.

    • 80%Less administrative load on HR teams
    • 90%Faster onboarding of a new organisation
    • 100%Of employee data access recorded

    Silver Scintilla provided the best solution with scalable functionality, personalized features, and robust security.

    Suheb Khan, Director, Collaborative Insight Technologies
    View case study: Web-Based HRM System
  18. Web-Based Coupon Platform
    • Retail & Loyalty
    • Web
    • Rules engine

    Web-Based Coupon Platform

    Engagement length
    1 year 1 month
    Platform
    Web application

    A coupon platform where offers carry real validity rules and every redemption is recorded once, against the rules that applied.

    • 45%Increase in offer redemption
    • 70%Faster campaign setup for merchants
    • 0Duplicate redemptions

    The work produced by the team was of exceptional quality.

    Jon Thies, CTO, Model Rocket
    View case study: Web-Based Coupon Platform
  19. SaaS Startup
    • SaaS
    • Multi-tenant

    SaaS MVP to Multi-Tenant v1

    Industry
    Software startups
    Timeline
    16–24 weeks

    An MVP turned into a multi-tenant SaaS v1 with billing, security, onboarding and CI/CD.

    • Self-serveCustomer onboarding
    • Enterprise-readySecurity basics
    • WeeklyRelease cadence
    View case study: SaaS MVP to Multi-Tenant v1
  20. Field Services
    • SaaS
    • Multi-tenant

    Job Management SaaS for Trade Businesses

    Industry
    Trades & field services
    Timeline
    28–36 weeks

    A multi-tenant job management product a small trade business can sign up for and use the same day.

    • 25–40%Of trials converting to paid plans
    • Same dayFrom sign-up to the first scheduled job
    • Under 3%Monthly customer churn
    View case study: Job Management SaaS for Trade Businesses
  21. Beauty
    • SaaS
    • Payments

    Booking SaaS for Salons and Spas

    Industry
    Salons & spas
    Timeline
    24–30 weeks

    A booking and payments product where every salon gets its own branded page, deposits and a waitlist.

    • 30–50%Fewer no-shows
    • 40–60%Of bookings made online
    • Under 10 minutesTo set up a salon
    View case study: Booking SaaS for Salons and Spas
  22. Fleet
    • SaaS
    • IoT data

    Fleet Telematics SaaS Platform

    Industry
    Fleet operators
    Timeline
    30–40 weeks

    A telematics platform that takes in millions of vehicle positions a day and gives each fleet its own live map and reports.

    • Under 10 secondsFrom a vehicle moving to the map updating
    • 99.9%Platform availability
    • 8–15%Lower fuel cost for fleets using driver scores
    View case study: Fleet Telematics SaaS Platform
  23. Legal
    • SaaS
    • Security

    Practice Management SaaS for Law Firms

    Industry
    Law firms
    Timeline
    30–38 weeks

    Matters, documents, time and billing for small law firms, with a separate database and a full audit trail for every firm.

    • 15–25%More billable time captured
    • 50–70%Less time preparing bills
    • 100%Of document access recorded
    View case study: Practice Management SaaS for Law Firms
  24. Recruitment
    • SaaS
    • HR tech

    Applicant Tracking SaaS

    Industry
    Recruitment
    Timeline
    26–32 weeks

    An applicant tracking product with pipelines each company can shape, careers pages, scheduling and data protection built in.

    • 30–45%Shorter time to hire
    • 100%Of candidates given a reply
    • 2–4 weeksFrom a customer signing up to hiring through the product
    View case study: Applicant Tracking SaaS
  25. Wholesale
    • SaaS
    • Integrations

    Order and Inventory SaaS for Wholesalers

    Industry
    Wholesale
    Timeline
    28–36 weeks

    One stock figure across trade counter, web shop and marketplaces, connected to the accounting software wholesalers already use.

    • 70–90%Fewer oversold orders
    • 60–80%Less manual order entry
    • MinutesFor a stock change to reach every channel
    View case study: Order and Inventory SaaS for Wholesalers
  26. Energy
    • SaaS
    • Time-series data

    Energy Monitoring SaaS for Buildings

    Industry
    Energy management
    Timeline
    24–32 weeks

    Meter and sensor data turned into a subscription product: hourly dashboards, waste alerts and sustainability reports per site.

    • 8–15%Lower energy use in monitored buildings
    • HoursTo notice abnormal consumption
    • Days → minutesTo produce a sustainability report
    View case study: Energy Monitoring SaaS for Buildings
  27. Insurance
    • SaaS
    • White-label

    White-Label SaaS for Insurance Brokers

    Industry
    Insurance
    Timeline
    32–40 weeks

    A white-label quote and policy platform: each broker's own portal, with products and rates held as configuration.

    • MinutesFrom a customer starting a quote to holding a policy
    • 2–4 weeksTo launch a new broker
    • 100%Of quotes and changes recorded
    View case study: White-Label SaaS for Insurance Brokers
  28. Fitness & Yoga
    • Fitness
    • Mobile & Web
    • Cross-platform

    Fitness & Yoga Booking Platform

    Engagement length
    2 years
    Platform
    iOS · Android · Web

    A holistic wellness platform that blends fitness and yoga, with personalized routines for every user on mobile and web.

    • 70%Increase in repeat bookings
    • 90%Less booking admin for studio owners
    • 45%Growth in memberships and class packs sold

    Overall, we were pleased with the collaboration and the final product delivered.

    Erik Falkeskog, Founder & Project Owner, Peach
    View case study: Fitness & Yoga Booking Platform
  29. Travel
    • Hotel & Travel
    • Mobile & Web
    • Cross-platform

    Hotel Booking & Trip Planning App

    Industry
    Travel & hospitality
    Platform
    iOS · Android · Web

    A travel app that books hotels and plans trips in a few taps, with personalized recommendations and helpful support along the way.

    • 47%More bookings completed
    • 35%Reduction in drop-off at checkout
    • 60%Growth in repeat bookings
    View case study: Hotel Booking & Trip Planning App
  30. IoT Platform Mobile App
    • IoT & Energy
    • Mobile
    • Native

    IoT Platform Mobile App

    Engagement length
    1 year 5 months
    Platform
    iOS · Android

    A mobile app for connected equipment in the field: live device data, controls that confirm, and alerts that reach the right person.

    • 60%Faster response to equipment faults
    • 45%Fewer return visits to site
    • 3xMore devices monitored per technician

    The project manager does an excellent job, and the team is always available during the project.

    Arjen Schoneveld, Co-Founder, Dexels BV
    View case study: IoT Platform Mobile App
  31. Food Delivery Marketplace
    • On-Demand
    • Mobile
    • Three-sided

    Food Delivery Marketplace

    Industry
    On-demand & food delivery
    Platform
    iOS · Android · Tablet · Web

    A customer app, a kitchen terminal and a courier app over one order state machine, with dispatch that accounts for preparation time.

    • 28%Faster average delivery time
    • 45%Fewer cancelled orders
    • 60%Increase in repeat orders
    View case study: Food Delivery Marketplace
  32. Idea-to-Launch Mobile App
    • Product
    • Mobile
    • iOS & Android

    Idea-to-Launch Mobile App

    Engagement length
    2 years 1 month
    Platform
    iOS · Android

    A concept taken to a shipped product on both app stores, then improved for two years rather than handed over at launch.

    • 2xFaster feature delivery after launch
    • 100%Of store submissions passed first time
    • 2 yrsOf continuous improvement after launch

    Because of their expertise, our app became great instead of being just an idea.

    Robin Jansson, CTO, Necito Software
    View case study: Idea-to-Launch Mobile App
  33. Facilities
    • Mobile app
    • Offline-first

    Offline Field Technician App

    Industry
    Facilities management
    Timeline
    12–18 weeks

    Jobs, checklists, photos and signatures completed offline, synced to the office when signal returns.

    • 30–60 minSaved per technician per day
    • Same dayJob data in the office
    • FewerDisputed jobs
    View case study: Offline Field Technician App
  34. Healthcare
    • Mobile app
    • Healthcare

    Patient Appointments App

    Industry
    Healthcare
    Timeline
    14–20 weeks

    Booking, reminders, pre-visit forms and secure messages for patients of a clinic group.

    • 20–40%Fewer no-shows
    • 30–50%Of bookings made in the app
    • BeforeForms completed before the visit
    View case study: Patient Appointments App
  35. Food & Beverage
    • Mobile app
    • Loyalty

    Loyalty and Order-Ahead for Cafés

    Industry
    Food & beverage
    Timeline
    12–18 weeks

    Order-ahead, payments and digital loyalty integrated with the tills of a café chain.

    • 10–20%Higher visit frequency for app users
    • MoreOrders handled at peak
    • KnownCustomer preferences
    View case study: Loyalty and Order-Ahead for Cafés
  36. Logistics
    • Mobile app
    • Proof of delivery

    Driver App with Proof of Delivery

    Industry
    Logistics
    Timeline
    10–16 weeks

    Routes, scanning, photo and signature proof of delivery and structured failure reasons for drivers.

    • 30–60%Fewer delivery disputes
    • StructuredFailure reasons
    • LiveCustomer tracking
    View case study: Driver App with Proof of Delivery
  37. Fintech
    • Mobile app
    • Document AI

    Expense and Receipt Capture App

    Industry
    Fintech
    Timeline
    14–20 weeks

    Receipt photos read automatically, matched to card transactions and exported to accounting software.

    • SecondsTo submit an expense
    • 90%+Receipt fields read correctly
    • AutomaticCard transaction matching
    View case study: Expense and Receipt Capture App
  38. Lettings
    • Mobile app
    • Inspections

    Property Inspection App

    Industry
    Property management
    Timeline
    10–14 weeks

    Room-by-room inspections with photos and branded reports produced on site, with check-out comparison.

    • 50–70%Less time producing reports
    • StrongerEvidence in deposit disputes
    • ConsistentReport quality
    View case study: Property Inspection App
  39. Workforce
    • Mobile app
    • HR integration

    Frontline Employee App

    Industry
    Retail & hospitality workforce
    Timeline
    12–18 weeks

    Rotas, shift swaps, payslips, news and training for frontline staff on their phones.

    • 60–80%Of staff active monthly
    • FewerUnfilled shifts
    • FasterReach for announcements
    View case study: Frontline Employee App
  40. Events
    • Mobile app
    • Events

    Reusable Conference App

    Industry
    Events
    Timeline
    10–14 weeks

    A configurable event app for agendas, schedules, networking and sponsors, reused for every conference.

    • 60–85%Of attendees using the app
    • DaysTo set up a new event
    • MeasuredSponsor exposure
    View case study: Reusable Conference App
  41. Education
    • Mobile app
    • Education

    Parent and School Communication App

    Industry
    Education
    Timeline
    12–18 weeks

    Messages, absence reporting, consent forms and payments for parents across a group of schools.

    • 30–50%Fewer calls to the school office
    • HigherConsent form return rates
    • FasterTrip and meal payments
    View case study: Parent and School Communication App
  42. Skin Care
    • eCommerce
    • Mobile & Web
    • Cross-platform

    Personalised Skincare Commerce

    Industry
    eCommerce & retail
    Platform
    Web · mobile web

    Simplified skincare shopping: a curated catalog of quality products, matched to each customer's needs.

    • 52%Increase in conversion rate
    • 38%Fewer returns
    • 30%Higher average order value
    View case study: Personalised Skincare Commerce
  43. eCommerce Build with Integrated Testing
    • eCommerce
    • Web
    • QA & Testing

    eCommerce Build with Integrated Testing

    Engagement length
    1 year
    Platform
    Web

    Design, development and testing of an eCommerce platform in one engagement, with payment failure paths tested before release.

    • 85%Fewer defects reaching production
    • 60%Faster release cycle
    • 100%Of payment failure paths covered

    They're a highly accommodating and skilled team.

    Steve Dunlap, President, Thursby Software Systems LLC
    View case study: eCommerce Build with Integrated Testing
  44. Headless Shopify for a Fashion Retailer
    • Shopify Plus
    • Headless
    • Next.js

    Headless Shopify for a Fashion Retailer

    Industry
    Fashion retail
    Platform
    Shopify Plus

    A Next.js storefront on the Storefront API: product pages in 0.6 seconds and mobile conversion up 34%.

    • +34%Mobile conversion rate
    • 0.6 sLargest Contentful Paint on product pages, from 4.8 s
    • +22%Organic search traffic
    View case study: Headless Shopify for a Fashion Retailer
  45. B2B Wholesale Portal on Shopify Plus
    • Shopify Plus
    • B2B
    • ERP integration

    B2B Wholesale Portal on Shopify Plus

    Industry
    Trade distribution
    Platform
    Shopify Plus

    Contract pricing and credit resolved live from the ERP, so 71% of wholesale orders are placed without a rep.

    • 71%Of orders placed without a rep
    • −96%Order entry errors
    • 2 minAverage reorder time, from 25 minutes
    View case study: B2B Wholesale Portal on Shopify Plus
  46. Coffee Subscription Commerce
    • Shopify
    • Subscriptions
    • Retention

    Coffee Subscription Commerce

    Industry
    Food & beverage
    Platform
    Shopify

    Subscribers who pause instead of cancelling, with dunning tuned to real declines — churn down 38%.

    • −38%Subscriber churn
    • 82%Of failed payments recovered
    • +2.4 moAverage subscriber lifetime
    View case study: Coffee Subscription Commerce
  47. International Expansion on Shopify Markets
    • Shopify Markets
    • Cross-border
    • Localisation

    International Expansion on Shopify Markets

    Industry
    Beauty & personal care
    Platform
    Shopify Markets

    Nine countries with local pricing and duties settled at checkout, and 2.8× the international revenue.

    • 2.8×International revenue
    • −67%International checkout abandonment
    • −89%Delivery refusals and customs complaints
    View case study: International Expansion on Shopify Markets
  48. Unified Retail and Online Commerce
    • Shopify POS
    • Unified commerce
    • Fulfilment

    Unified Retail and Online Commerce

    Industry
    Speciality retail
    Platform
    Shopify POS

    Twelve stores and an online shop on one stock position, turning every shop into a fulfilment point.

    • +29%Sell-through on slow lines
    • 41%Of online orders collected in store
    • −52%Markdown on end-of-season stock
    View case study: Unified Retail and Online Commerce
  49. Custom Checkout for an Electronics Retailer
    • Shopify Plus
    • Checkout extensions
    • Finance

    Custom Checkout for an Electronics Retailer

    Industry
    Electronics & appliances
    Platform
    Shopify Plus

    Finance, delivery slots and installation booked inside Shopify checkout — conversion up 19%.

    • +19%Checkout conversion
    • +34%Average order value
    • −44%Post-purchase delivery enquiries
    View case study: Custom Checkout for an Electronics Retailer
  50. Shopify to ERP Integration
    • Shopify
    • Integration
    • Event-driven

    Shopify to ERP Integration

    Industry
    Home goods & furniture
    Platform
    Shopify

    An event-driven integration that retries, reconciles and replays itself instead of paging somebody.

    • 0Orders re-keyed by hand
    • −98%Integration incidents requiring a person
    • 4 minStock accuracy window, from 24 hours
    View case study: Shopify to ERP Integration
  51. A Multi-Vendor Artisan Marketplace
    • Shopify
    • Marketplace
    • Split payouts

    A Multi-Vendor Artisan Marketplace

    Industry
    Craft & artisan retail
    Platform
    Shopify

    340 makers, one basket, and settlement computed per order line so nobody reconciles a spreadsheet.

    • 340Makers onboarded in the first year
    • 0Manual payout calculations
    • 2.1Vendors per order on average
    View case study: A Multi-Vendor Artisan Marketplace
  52. Virtual Try-On for an Eyewear Brand
    • Shopify
    • WebAR
    • On-device

    Virtual Try-On for an Eyewear Brand

    Industry
    Eyewear & accessories
    Platform
    Shopify

    True-scale AR try-on in the browser with no app and no face data uploaded — returns down 43%.

    • −43%Return rate
    • +27%Conversion on try-on sessions
    • 3.4×Frames viewed per session
    View case study: Virtual Try-On for an Eyewear Brand
  53. Made-to-Order Furniture Configurator
    • Shopify
    • Configurator
    • Made-to-order

    Made-to-Order Furniture Configurator

    Industry
    Furniture & home
    Platform
    Shopify

    Over two million valid combinations priced live, without creating a variant for any of them.

    • 2M+Valid combinations priced live
    • +58%Online order value share
    • −71%Manufacturing queries per order
    View case study: Made-to-Order Furniture Configurator
  54. Loyalty and Predictive Replenishment
    • Shopify
    • Retention
    • Prediction

    Loyalty and Predictive Replenishment

    Industry
    Pet supplies
    Platform
    Shopify

    Reminders timed to when each household actually runs out, and a repeat purchase rate up 46%.

    • +46%Repeat purchase rate
    • +31%Customer lifetime value
    • 4.2×Reminder click-through vs the old broadcast
    View case study: Loyalty and Predictive Replenishment
  55. Product Drops at Scale on Shopify Plus
    • Shopify Plus
    • Peak load
    • Bot mitigation

    Product Drops at Scale on Shopify Plus

    Industry
    Streetwear & footwear
    Platform
    Shopify Plus

    40,000 checkouts in ten minutes with a queue that is fair, and demonstrably so.

    • 40kCheckouts in the first ten minutes
    • 0Oversells across every drop
    • −91%Automated purchase attempts reaching checkout
    View case study: Product Drops at Scale on Shopify Plus
  56. Multi-Brand Commerce for a Retail Group
    • Shopify
    • Design system
    • Multi-store

    Multi-Brand Commerce for a Retail Group

    Industry
    Multi-brand retail
    Platform
    Shopify

    Six brands on shared infrastructure that still look like themselves, launching in three weeks each.

    • 3 wksTo launch a new brand, from 5 months
    • −64%Engineering cost per brand
    • +18%Group conversion rate
    View case study: Multi-Brand Commerce for a Retail Group
  57. A Core Web Vitals Rescue
    • Shopify
    • Performance
    • Core Web Vitals

    A Core Web Vitals Rescue

    Industry
    Mid-market retail
    Platform
    Shopify

    Twenty-three apps audited, eleven removed, all vitals passing — and revenue per session up 23%.

    • +23%Revenue per session
    • AllCore Web Vitals passing, on every template
    • −61%JavaScript shipped per page
    View case study: A Core Web Vitals Rescue
  58. Magento to Shopify Replatform
    • Shopify Plus
    • Replatform
    • Migration

    Magento to Shopify Replatform

    Industry
    Sports & fitness retail
    Platform
    Shopify Plus

    40,000 products migrated with zero organic traffic lost through cutover and running costs cut 58%.

    • −58%Platform running cost
    • 0%Organic traffic lost through cutover
    • +37%Mobile conversion rate
    View case study: Magento to Shopify Replatform
  59. Custom Apparel on Business Central
    • Microsoft Dynamics
    • Business Central
    • Made-to-order

    Custom Apparel on Business Central

    Industry
    Apparel & retail
    Platform
    Dynamics 365 Business Central

    Business Central extended so a configured garment can be costed, stocked against and manufactured without a SKU for every combination.

    • 0SKUs created per configuration
    • 95%Reduction in manual order entry
    • 4 hrsFaster quote turnaround
    View case study: Custom Apparel on Business Central
  60. Property Operations on Business Central
    • Microsoft Dynamics
    • Business Central
    • Property

    Property Operations on Business Central

    Industry
    Real estate
    Platform
    Dynamics 365 Business Central

    Leases, service charges and maintenance on one ERP, so a property manager stops reconciling four systems by hand every month.

    • 85%Faster service-charge reconciliation
    • 100%Of costs attributable to a unit
    • 0Spreadsheets in the quarterly close
    View case study: Property Operations on Business Central
  61. Charity Fund Accounting on Business Central
    • Microsoft Dynamics
    • Business Central
    • Fund accounting

    Charity Fund Accounting on Business Central

    Platform
    Dynamics 365 Business Central

    Restricted fund accounting enforced by the ledger, so a charity cannot spend a restricted donation on the wrong thing by accident.

    • 75%Faster donor reporting
    • 100%Of spend traceable to its fund
    • 0Restricted balances reconstructed by hand
    View case study: Charity Fund Accounting on Business Central
  62. Manufacturing ERP Migration to Business Central
    • Microsoft Dynamics
    • Business Central
    • NAV migration

    Manufacturing ERP Migration to Business Central

    Industry
    Chemicals & manufacturing
    Platform
    Dynamics 365 Business Central

    Fifteen years of Dynamics NAV customisation rebuilt as extensions, migrated in stages, with production never stopping.

    • 100%Of batch history migrated and reconciled
    • 0Days of production lost at cutover
    • 2 minsTo trace a batch end to end
    View case study: Manufacturing ERP Migration to Business Central
  63. Wholesale & Distribution
    • Business Central
    • ERP migration

    Business Central for a Multi-Site Distributor

    Industry
    Wholesale & distribution
    Timeline
    16–24 weeks

    How we bring stock, purchasing and finance for a multi-site distributor into Business Central, one site at a time.

    • 30–50%Faster month-end close
    • 15–25%Less excess stock held
    • 60–80%Fewer manual order entries
    View case study: Business Central for a Multi-Site Distributor
  64. Food Manufacturing
    • Business Central
    • Traceability

    Lot Traceability on Business Central

    Industry
    Food & beverage manufacturing
    Timeline
    14–20 weeks

    Lot tracking from supplier to customer, expiry-aware picking and recall reports in minutes for a food manufacturer.

    • MinutesTo trace a lot forwards or backwards
    • 20–40%Less stock written off to expiry
    • 50–70%Less time preparing for audits
    View case study: Lot Traceability on Business Central
  65. Professional Services
    • Business Central
    • Project accounting

    Project Billing on Business Central

    Industry
    Professional services
    Timeline
    10–16 weeks

    Timesheets, budgets, work in progress and billing in one place, so a services firm invoices within days of month-end.

    • 3–8%More billable time captured
    • 1–3 daysFrom month-end to invoices sent
    • WeeklyMargin per project
    View case study: Project Billing on Business Central
  66. Construction
    • Business Central
    • Job costing

    Job Costing for a Construction Contractor

    Industry
    Construction
    Timeline
    14–22 weeks

    Committed cost, subcontractor retentions and valuations per job, so directors see margin before a job ends.

    • MonthlyCost-to-complete per job
    • 30–50%Less time on valuations
    • Near zeroUnapproved supplier invoices
    View case study: Job Costing for a Construction Contractor
  67. eCommerce
    • Business Central
    • Shopify

    Shopify and Business Central Integration

    Industry
    eCommerce
    Timeline
    8–12 weeks

    Orders, stock, refunds and payouts flowing between Shopify and Business Central, so nobody retypes an order again.

    • 90–100%Orders posted without typing
    • 1–2 daysTo reconcile payouts
    • MinutesStock sync delay
    View case study: Shopify and Business Central Integration
  68. Group Finance
    • Business Central
    • Consolidation

    Group Consolidation on Business Central

    Industry
    Multi-company groups
    Timeline
    16–26 weeks

    A group of companies on one Business Central setup with automated intercompany and a consolidated month-end.

    • 40–60%Faster group close
    • Near zeroUnmatched intercompany balances
    • OneChart of accounts across the group
    View case study: Group Consolidation on Business Central
  69. Medical Devices
    • Business Central
    • Serial tracking

    Device Traceability on Business Central

    Industry
    Medical devices
    Timeline
    14–20 weeks

    Serial and lot tracking, loan kits, expiry and safety notices in Business Central for a medical device distributor.

    • HoursTo act on a field safety notice
    • 20–35%Fewer lost or late loan kits
    • 15–30%Less expired stock
    View case study: Device Traceability on Business Central
  70. Warehousing
    • Business Central
    • Barcode scanning

    Warehouse Scanning on Business Central

    Industry
    Warehousing
    Timeline
    8–14 weeks

    Bins, barcode scanning and cycle counts in Business Central, so every pick is confirmed and stock matches the shelf.

    • 60–90%Fewer picking errors
    • 15–30%Faster picking
    • ContinuousStock counts instead of annual
    View case study: Warehouse Scanning on Business Central
  71. Manufacturing
    • Business Central
    • NAV upgrade

    NAV to Business Central Upgrade

    Industry
    Manufacturing
    Timeline
    16–28 weeks

    A customised Dynamics NAV system moved to Business Central online, with modifications rebuilt as extensions.

    • 30–60%Fewer custom modifications
    • Twice a yearMicrosoft updates applied
    • ZeroOn-premises servers to maintain
    View case study: NAV to Business Central Upgrade
  72. Equipment Hire
    • Business Central
    • Rental management

    Equipment Hire on Business Central

    Industry
    Equipment hire
    Timeline
    16–24 weeks

    Fleet, hire contracts, inspections and hire invoicing in Business Central, so nothing on hire goes unbilled.

    • 2–5%More hire revenue billed
    • 10–20%Better fleet utilisation
    • Same dayHire invoices after off-hire
    View case study: Equipment Hire on Business Central
  73. Education
    • Business Central
    • Budgeting

    Group Finance for a School Trust

    Industry
    Education
    Timeline
    12–18 weeks

    One set of books for a group of schools, with live budgets and purchase approvals for every head teacher.

    • LiveBudget position for every school
    • 30–50%Faster month-end
    • On demandGrant spend reports
    View case study: Group Finance for a School Trust
  74. SaaS
    • Business Central
    • Recurring billing

    Subscription Billing on Business Central

    Industry
    Software & subscriptions
    Timeline
    10–16 weeks

    Contracts, recurring and usage billing, and revenue recognition in Business Central, with one agreed MRR.

    • HoursTo run the monthly billing
    • AutomaticDeferred revenue
    • 1–3%Revenue leakage recovered
    View case study: Subscription Billing on Business Central
  75. Patient Care CRM with Copilot
    • Microsoft Dynamics
    • Dynamics 365 CRM
    • Copilot

    Patient Care CRM with Copilot

    Industry
    Healthcare
    Platform
    Dynamics 365 CRM

    Care coordination on Dynamics 365 with Copilot summarising the record — and never inventing a clinical fact.

    • 60%Less time writing up contacts
    • 100%Of AI drafts reviewed before saving
    • 3xFaster shift handover
    View case study: Patient Care CRM with Copilot
  76. Insurance CRM & Reporting Automation
    • Microsoft Dynamics
    • Dynamics 365 CRM
    • Reporting

    Insurance CRM & Reporting Automation

    Industry
    Insurance
    Platform
    Dynamics 365 CRM

    Policy, claim and broker data on one CRM, with regulatory reporting produced from the record instead of assembled in spreadsheets.

    • 40%More renewals worked before expiry
    • 90%Less time producing management reports
    • 1View of a policyholder
    View case study: Insurance CRM & Reporting Automation
  77. Debt Collection Operations CRM
    • Microsoft Dynamics
    • Dynamics 365 CRM
    • Compliance

    Debt Collection Operations CRM

    Industry
    Financial services
    Platform
    Dynamics 365 CRM

    Contact rules enforced before an account reaches an agent, so a collections breach is structurally impossible rather than trained against.

    • 0Contacts outside permitted hours or frequency
    • 100%Of actions attributable and time-stamped
    • 35%More accounts worked per agent per day
    View case study: Debt Collection Operations CRM
  78. Gas Outage Management System
    • Microsoft Dynamics
    • Dynamics 365 CRM
    • Incident management

    Gas Outage Management System

    Industry
    Government & utilities
    Platform
    Dynamics 365 CRM

    Two hundred reports clustered into one incident, dispatched once, with a single restoration estimate every channel reads.

    • 4 minFrom first report to crew dispatched
    • 96%Of reports clustered automatically
    • 1Restoration estimate per incident
    View case study: Gas Outage Management System
  79. Field Service for Material Handling
    • Microsoft Dynamics
    • Field Service
    • Scheduling

    Field Service for Material Handling

    Industry
    Manufacturing
    Platform
    Dynamics 365 Field Service

    Scheduling that treats van stock and engineer certification as hard constraints, so the engineer who arrives can finish the job.

    • +31%First-time fix rate
    • 0Jobs assigned without required certification
    • −42%Van stock write-offs
    View case study: Field Service for Material Handling
  80. Smart Warranty & Service Ticketing
    • Microsoft Dynamics
    • Dynamics 365 CRM
    • Warranty

    Smart Warranty & Service Ticketing

    Industry
    Manufacturing
    Platform
    Dynamics 365 CRM

    Warranty decided from the serial number rather than the claim form, with supplier recovery raised automatically from the component trace.

    • −28%Warranty cost leakage
    • 3.2×Supplier recovery on component failures
    • 100%Of failures reaching engineering as data
    View case study: Smart Warranty & Service Ticketing
  81. HOA Resident Support with Copilot
    • Microsoft Dynamics
    • Copilot
    • Grounded AI

    HOA Resident Support with Copilot

    Industry
    Real estate
    Platform
    Dynamics 365 CRM, Copilot

    Copilot drafting resident replies from each community's own governing documents, citing the clause every time or escalating instead.

    • −61%Time to first reply
    • 100%Of drafted answers carrying a citation
    • 0Cross-community rule leakage
    View case study: HOA Resident Support with Copilot
  82. Industrial B2B
    • Dynamics 365 Sales
    • Quoting

    Sales and Quoting on Dynamics 365

    Industry
    Industrial manufacturing
    Timeline
    10–16 weeks

    Dynamics 365 Sales with ERP pricing, discount approvals and a pipeline forecast for a B2B manufacturer.

    • 50–70%Faster quote turnaround
    • WeeklyForecast reviews from the pipeline
    • 10–20%More quotes followed up
    View case study: Sales and Quoting on Dynamics 365
  83. Utilities
    • Customer Service
    • Omnichannel

    Omnichannel Service for a Utility

    Industry
    Utilities
    Timeline
    12–20 weeks

    Phone, email, chat and web cases in one Dynamics 365 queue, with SLAs and a knowledge base for agents.

    • 10–25%Shorter average handling time
    • 5–15 ptsHigher first-contact resolution
    • LiveService level visibility
    View case study: Omnichannel Service for a Utility
  84. Building Services
    • Field Service
    • Scheduling

    Field Service for HVAC Maintenance

    Industry
    Building services
    Timeline
    14–22 weeks

    Contracts, scheduling and a technician app on Dynamics 365 Field Service, from call-out to same-day invoice.

    • 10–20%More jobs per technician per day
    • 10–25%Higher first-time fix rate
    • Same dayInvoice after job completion
    View case study: Field Service for HVAC Maintenance
  85. Estate Agency
    • Dynamics 365
    • Property CRM

    Estate Agency CRM on Dynamics 365

    Industry
    Estate agency
    Timeline
    10–16 weeks

    Portal leads, applicant matching and viewing feedback in Dynamics 365 for a multi-branch estate agency.

    • MinutesFrom portal lead to first call
    • 20–40%More viewings booked per lead
    • 100%Viewings with recorded feedback
    View case study: Estate Agency CRM on Dynamics 365
  86. Higher Education
    • Dynamics 365
    • Customer Insights

    Admissions CRM for a University

    Industry
    Higher education
    Timeline
    14–22 weeks

    Enquiries, events, applications and offer-holder journeys on Dynamics 365, from first contact to enrolment.

    • 3–8 ptsHigher offer-to-enrolment conversion
    • OneView of each applicant
    • 30–50%Less manual list-building
    View case study: Admissions CRM for a University
  87. Healthcare
    • Dynamics 365
    • Power Pages

    Referral Management for a Clinic Group

    Industry
    Healthcare
    Timeline
    10–16 weeks

    Every patient referral tracked from arrival to appointment, with a referrer portal, on Dynamics 365.

    • 30–50%Faster referral to booked appointment
    • Near zeroReferrals without an owner
    • MonthlyReferrer activity reviews
    View case study: Referral Management for a Clinic Group
  88. Non-profit
    • Dynamics 365
    • Fundraising

    Fundraising CRM for a Charity

    Industry
    Non-profit
    Timeline
    12–18 weeks

    Supporters, donations, regular giving and consent-aware journeys in one Dynamics 365 database for a charity.

    • 5–15%Better regular-giver retention
    • DaysTo thank a donor, not weeks
    • CompleteTax reclaims on eligible gifts
    View case study: Fundraising CRM for a Charity
  89. Wealth Management
    • Dynamics 365
    • Compliance

    Client Management for Wealth Advisers

    Industry
    Wealth management
    Timeline
    12–18 weeks

    Households, digital onboarding, scheduled reviews and suitability records on Dynamics 365 for advisers.

    • Near 100%Reviews completed on schedule
    • 30–50%Faster client onboarding
    • CompleteAudit trail per recommendation
    View case study: Client Management for Wealth Advisers
  90. B2B Support
    • Power Pages
    • Customer Service

    Customer Self-Service Portal

    Industry
    B2B software and services
    Timeline
    8–14 weeks

    A branded Power Pages portal where customers raise and track cases and find answers, on Dynamics 365.

    • 15–30%Cases resolved through self-service
    • 30–50%Fewer 'any update?' emails
    • 24/7Case submission
    View case study: Customer Self-Service Portal
  91. Retail
    • Customer Insights
    • Marketing automation

    Customer Insights for a Retailer

    Industry
    Retail
    Timeline
    12–20 weeks

    Store, online and loyalty data unified into one profile, with measured, personalised journeys.

    • 10–25%Higher email revenue per send
    • OneProfile per customer
    • Weeks → daysTo launch a new segment
    View case study: Customer Insights for a Retailer
  92. CRM Migration
    • Dynamics 365
    • Migration

    Salesforce to Dynamics 365 Migration

    Industry
    Professional services
    Timeline
    12–20 weeks

    Accounts, opportunities, activities and integrations moved from Salesforce to Dynamics 365 with history intact.

    • 100%Of agreed records migrated
    • WeekendCut-over window
    • VariesLicence cost change
    View case study: Salesforce to Dynamics 365 Migration
  93. Dealer Network
    • Dynamics 365
    • Partner portal

    Dealer Network on Dynamics 365

    Industry
    Equipment manufacturing
    Timeline
    12–18 weeks

    Lead distribution, a shared pipeline and warranty claims with dealers through a Dynamics 365 partner portal.

    • FullVisibility of distributed leads
    • 20–40%Faster warranty claim handling
    • MonthlyDealer performance reviews
    View case study: Dealer Network on Dynamics 365
  94. Hospitality
    • Dynamics 365 Sales
    • Events

    Group Sales and Events for Hotels

    Industry
    Hospitality
    Timeline
    10–16 weeks

    Corporate accounts, event enquiries and same-day proposals on Dynamics 365 for a hotel group.

    • Same dayProposal turnaround
    • 10–20%Higher enquiry conversion
    • OneView of corporate accounts
    View case study: Group Sales and Events for Hotels
  95. Housing
    • Customer Service
    • Tenant portal

    Tenant Services and Repairs

    Industry
    Housing
    Timeline
    14–22 weeks

    Repairs, complaints and a tenant portal on Dynamics 365, with every case tracked to its deadline.

    • 20–40%Fewer 'where's my repair?' calls
    • TrackedEvery complaint against its deadline
    • LiveRepairs performance by contractor
    View case study: Tenant Services and Repairs
  96. Centralised Retail Control on D365 F&O
    • Microsoft Dynamics
    • Finance & Operations
    • Retail

    Centralised Retail Control on D365 F&O

    Industry
    Retail & eCommerce
    Platform
    Dynamics 365 Finance & Operations

    Ninety stores across four countries on one product and pricing master, with stores that keep trading through a network failure.

    • Same dayGroup trading position, down from 11 days
    • 4 hrsTo push a price change across the estate, from 9 days
    • 100%Store trading continuity during network loss
    View case study: Centralised Retail Control on D365 F&O
  97. Real-Time Inventory Integration
    • Microsoft Dynamics
    • Finance & Operations
    • Integration

    Real-Time Inventory Integration

    Industry
    Logistics & distribution
    Platform
    Dynamics 365 Finance & Operations

    Warehouse scanners, ERP and every sales channel on one live stock position, with allocation reserved at order time.

    • −94%Overselling incidents
    • <1 secFrom warehouse scan to channel availability
    • −37%Safety stock held
    View case study: Real-Time Inventory Integration
  98. International Distribution
    • D365 Finance
    • Global template

    Global F&O Rollout for a Distributor

    Industry
    International distribution
    Timeline
    9–18 months

    One Dynamics 365 F&O template rolled out country by country, with localisations and automated intercompany.

    • 30–60%Faster group close
    • AutomatedIntercompany trading
    • FasterEach subsequent country go-live
    View case study: Global F&O Rollout for a Distributor
  99. Discrete Manufacturing
    • D365 SCM
    • Master planning

    Production Planning on D365 SCM

    Industry
    Discrete manufacturing
    Timeline
    9–14 months

    BOMs, capacity-aware planning, shop floor execution and costing on Dynamics 365 Supply Chain Management.

    • 5–15 ptsBetter on-time delivery
    • 10–25%Lower work in progress
    • Per orderProduction cost variances
    View case study: Production Planning on D365 SCM
  100. Chemicals
    • D365 SCM
    • Batch management

    Process Manufacturing on D365

    Industry
    Process manufacturing
    Timeline
    10–16 months

    Formulas, batch attributes, quality release and compliance on Dynamics 365 for a chemicals producer.

    • MinutesTo trace a batch
    • 20–40%Faster quality release
    • 1–3%Yield improvement targeted
    View case study: Process Manufacturing on D365
  101. Distribution Centre
    • D365 SCM
    • WMS

    Advanced Warehousing on D365 SCM

    Industry
    Third-party logistics
    Timeline
    6–10 months

    Wave picking, license plates, mobile work and carrier integration on Dynamics 365 advanced warehousing.

    • 99.5%+Pick accuracy target
    • 15–30%Higher lines picked per hour
    • LiveWork queue visibility
    View case study: Advanced Warehousing on D365 SCM
  102. ERP Upgrade
    • D365 F&O
    • AX upgrade

    AX 2012 to D365 F&O Upgrade

    Industry
    Manufacturing & distribution
    Timeline
    6–12 months

    AX 2012 upgraded to Dynamics 365 F&O, with customisations rebuilt as extensions and a rehearsed cut-over.

    • 30–50%Of customisations retired
    • ContinuousMicrosoft updates
    • ZeroAX servers to maintain
    View case study: AX 2012 to D365 F&O Upgrade
  103. Retail Chain
    • D365 Commerce
    • POS

    Dynamics 365 Commerce for a Retail Chain

    Industry
    Retail chains
    Timeline
    9–15 months

    Store POS, central pricing and promotions, replenishment and finance on Dynamics 365 Commerce.

    • Near real timeStore sales at head office
    • 10–20%Less excess store stock
    • HoursTo launch a promotion across stores
    View case study: Dynamics 365 Commerce for a Retail Chain
  104. Engineering Services
    • Project Operations
    • Resourcing

    Project Operations for an Engineering Firm

    Industry
    Engineering services
    Timeline
    8–14 months

    Estimates, skills-based resourcing, time, revenue recognition and billing on Dynamics 365 Project Operations.

    • 3–8 ptsHigher billable utilisation
    • 30–50%Faster billing cycle
    • MonthlyProject margin forecasts
    View case study: Project Operations for an Engineering Firm
  105. Corporate Finance
    • D365 Finance
    • Financial close

    Faster Close on D365 Finance

    Industry
    Corporate finance
    Timeline
    12–20 weeks

    Close tasks, automated journals, consolidation and Power BI reporting for a shorter, predictable month-end.

    • 30–50%Shorter close
    • FewerManual journals
    • Day 1–3Management reporting available
    View case study: Faster Close on D365 Finance
  106. Consumer Goods
    • D365 SCM
    • Demand planning

    Demand Planning on Dynamics 365

    Industry
    Consumer goods
    Timeline
    12–20 weeks

    Statistical forecasts, sales input and promotions in one agreed forecast that drives supply planning.

    • 10–25%Better forecast accuracy
    • 10–20%Lower safety stock
    • MonthlyStructured S&OP
    View case study: Demand Planning on Dynamics 365
  107. Utilities
    • D365 Asset Management
    • Maintenance

    Asset Management for a Utility

    Industry
    Utilities
    Timeline
    8–14 months

    Asset register, preventive maintenance, mobile work orders and costs per asset on Dynamics 365.

    • 10–25 ptsMore planned vs reactive work
    • 10–20%Lower spare parts stock
    • Per assetMaintenance cost history
    View case study: Asset Management for a Utility
  108. Customer Support
    • Azure OpenAI
    • RAG

    AI Support Assistant with Sources

    Industry
    B2B software
    Timeline
    8–12 weeks

    An assistant that answers from your own documentation with sources, hands over to people and is tested before launch.

    • 20–40%Of common questions resolved without an agent
    • 90%+Answer accuracy on the test set
    • AlwaysSource links on answers
    View case study: AI Support Assistant with Sources
  109. Finance Operations
    • Document AI
    • ERP integration

    AI Invoice Processing into the ERP

    Industry
    Finance operations
    Timeline
    8–12 weeks

    Supplier invoices read by AI, matched to orders and posted to the ERP, with people reviewing only exceptions.

    • 60–85%Invoices posted without manual entry
    • 95%+Field extraction accuracy
    • Days → hoursInvoice processing time
    View case study: AI Invoice Processing into the ERP
  110. Retail
    • Machine learning
    • Forecasting

    ML Demand Forecasting for Retail

    Industry
    Retail
    Timeline
    10–16 weeks

    SKU-store demand forecasts with promotions and seasonality, backtested against the current method.

    • 10–30%Lower forecast error
    • 5–15%Less excess stock
    • WeeklyAutomatic retraining
    View case study: ML Demand Forecasting for Retail
  111. Industrial
    • Machine learning
    • IoT

    Predictive Maintenance with ML

    Industry
    Industrial equipment
    Timeline
    12–20 weeks

    Sensor data and machine learning that flag developing faults early and raise maintenance before breakdowns.

    • 20–40%Fewer unplanned stoppages
    • EarlierWarning of developing faults
    • TrackedFalse alarm rate
    View case study: Predictive Maintenance with ML
  112. Manufacturing
    • Computer vision
    • Edge AI

    Computer Vision Quality Inspection

    Industry
    Manufacturing
    Timeline
    12–20 weeks

    Cameras and computer vision that inspect every part at line speed, with operators reviewing uncertain cases.

    • 95%+Defect detection on validated defect types
    • 100%Of parts inspected
    • LowerCustomer returns for visual defects
    View case study: Computer Vision Quality Inspection
  113. Fitness
    • Machine learning
    • Retention

    Churn Prediction for a Gym Chain

    Industry
    Fitness
    Timeline
    8–14 weeks

    Weekly churn risk scores with reasons, retention actions for clubs and results measured against control groups.

    • 2–6 ptsLower monthly churn in targeted groups
    • WeeklyUpdated risk scores
    • MeasuredEffect of each retention action
    View case study: Churn Prediction for a Gym Chain
  114. Property
    • Machine learning
    • CRM

    Lead Scoring for Property Sales

    Industry
    Property
    Timeline
    6–10 weeks

    Explainable lead scores in the CRM so agents call the buyers most likely to reserve first.

    • 2–4×Higher conversion in the top score band
    • FasterResponse to high-intent leads
    • VisibleWhy each lead scores high
    View case study: Lead Scoring for Property Sales
  115. Healthcare
    • Generative AI
    • Clinical workflow

    AI Clinical Documentation Assistant

    Industry
    Healthcare
    Timeline
    10–16 weeks

    AI drafts of clinical letters from consultation notes, always reviewed and signed by the clinician.

    • 30–50%Less time writing letters
    • 100%Drafts reviewed by a clinician
    • TrackedDraft quality ratings
    View case study: AI Clinical Documentation Assistant
  116. Payments
    • Machine learning
    • Fraud detection

    Transaction Anomaly Detection

    Industry
    Payments
    Timeline
    12–18 weeks

    Real-time risk scores alongside existing rules, tested in shadow mode, with fewer genuine customers blocked.

    • 20–40%Fewer false positives at the same catch rate
    • Real timeScoring at transaction time
    • DocumentedModel decisions
    View case study: Transaction Anomaly Detection
  117. Internal IT
    • AI agents
    • Microsoft Teams

    AI Agent for the IT Helpdesk

    Industry
    Internal IT
    Timeline
    8–14 weeks

    An AI agent in Teams that answers IT questions and completes approved, logged actions.

    • 25–45%Of routine tickets resolved by the agent
    • MinutesTo resolve routine requests
    • 100%Actions logged and scoped
    View case study: AI Agent for the IT Helpdesk
  118. Legal
    • Generative AI
    • Document analysis

    AI Contract Review

    Industry
    Legal & procurement
    Timeline
    10–14 weeks

    Key clauses extracted and compared with your playbook, with a searchable register and lawyers deciding.

    • 40–60%Faster first-pass review
    • 90%+Clause extraction accuracy
    • SearchableContract register
    View case study: AI Contract Review
  119. Health & Beauty
    • Machine learning
    • Personalisation

    Product Recommendations for eCommerce

    Industry
    eCommerce
    Timeline
    8–12 weeks

    Personalised recommendations on site and in email, each placement proven by A/B test before rollout.

    • 3–10%Higher revenue per session in test groups
    • TestedEvery placement
    • DailyModel refresh
    View case study: Product Recommendations for eCommerce
  120. Delivery
    • Optimisation
    • Machine learning

    Route Optimisation and ETA Prediction

    Industry
    Delivery
    Timeline
    10–16 weeks

    Optimised delivery routes and ML arrival times that cut miles and failed drops.

    • 5–15%Fewer miles per delivery
    • NarrowerCustomer delivery windows
    • 10–25%Fewer failed deliveries targeted
    View case study: Route Optimisation and ETA Prediction
  121. Education
    • Generative AI
    • LMS

    AI Feedback Assistant for Teachers

    Industry
    Education
    Timeline
    10–14 weeks

    Rubric-aligned feedback drafts that teachers edit and approve, with safeguarding and student data protection.

    • 30–50%Less time writing feedback
    • 100%Feedback approved by a teacher
    • FasterFeedback to students
    View case study: AI Feedback Assistant for Teachers
  122. Public Sector
    • Azure OpenAI
    • SharePoint

    AI Knowledge Search for Staff

    Industry
    Public sector
    Timeline
    8–12 weeks

    Answers from SharePoint and policy documents with sources, respecting each person's existing permissions.

    • 30–50%Less time searching for information
    • EnforcedDocument permissions
    • 90%+Grounded answers on the test set
    View case study: AI Knowledge Search for Staff
  123. Manufacturing
    • Power BI
    • Data platform

    Power BI for a Multi-Site Manufacturer

    Industry
    Manufacturing
    Timeline
    8–14 weeks

    Daily output, scrap, downtime and margin for every plant, from one data model that operations and finance both trust.

    • 60–80%Less time spent building reports
    • DailyInstead of monthly visibility
    • 5–15%Downtime reduction targeted
    View case study: Power BI for a Multi-Site Manufacturer
  124. Retail
    • Power BI
    • Retail analytics

    Power BI for Retail Trading

    Industry
    Retail
    Timeline
    8–12 weeks

    Daily sales, margin, stock cover and promotion results by store and channel in Power BI.

    • DailySales and margin visibility
    • 60–80%Less time building reports
    • EarlierStock and promotion decisions
    View case study: Power BI for Retail Trading
  125. Finance
    • Power BI
    • Finance reporting

    Management Accounts in Power BI

    Industry
    Finance
    Timeline
    6–10 weeks

    Management accounts, budget comparison and a 13-week cash forecast in Power BI, ready the day after close.

    • 2–4 daysSaved each month on the board pack
    • 13 weeksRolling cash visibility
    • OneVersion of the numbers
    View case study: Management Accounts in Power BI
  126. Healthcare
    • Power BI
    • Healthcare analytics

    Clinic Operations in Power BI

    Industry
    Healthcare
    Timeline
    8–12 weeks

    Utilisation, no-shows, waiting times and revenue per clinic in Power BI, with patient data kept out of reports.

    • 5–15 ptsHigher clinician utilisation
    • 10–30%Fewer no-shows targeted
    • WeeklyWaiting time reviews
    View case study: Clinic Operations in Power BI
  127. Logistics
    • Power BI
    • OTIF

    Delivery Performance in Power BI

    Industry
    Logistics
    Timeline
    8–14 weeks

    Daily on-time in-full, failed deliveries and cost per drop from transport and telematics data in Power BI.

    • DailyOTIF by customer and depot
    • 10–20%Fewer failed deliveries targeted
    • Per dropDelivery cost visibility
    View case study: Delivery Performance in Power BI
  128. B2B Sales
    • Power BI
    • Sales analytics

    Sales Pipeline Analytics in Power BI

    Industry
    B2B sales
    Timeline
    6–10 weeks

    Pipeline history, coverage, win rates and forecast accuracy from CRM data in Power BI.

    • 10–20%Better forecast accuracy
    • WeeklyPipeline coverage by team
    • VisibleStalled deals
    View case study: Sales Pipeline Analytics in Power BI
  129. HR
    • Power BI
    • HR analytics

    Workforce Analytics in Power BI

    Industry
    HR & workforce
    Timeline
    8–12 weeks

    Headcount, turnover, absence and recruitment in Power BI, with sensitive data protected by role.

    • 50–70%Less time on HR reporting
    • MonthlyTurnover and absence trends
    • ProtectedSensitive data
    View case study: Workforce Analytics in Power BI
  130. Hospitality
    • Power BI
    • Revenue management

    Hotel Revenue Analytics in Power BI

    Industry
    Hospitality
    Timeline
    8–12 weeks

    Occupancy, ADR, RevPAR, booking pace and channel mix for every hotel in the group, daily.

    • DailyPace versus last year and budget
    • 2–5%RevPAR improvement targeted
    • VisibleChannel costs
    View case study: Hotel Revenue Analytics in Power BI
  131. SaaS
    • Power BI Embedded
    • Multi-tenant

    Embedded Analytics in a SaaS Product

    Industry
    SaaS
    Timeline
    8–14 weeks

    Customer-facing Power BI inside a SaaS app, with tested tenant isolation and capacity sized to usage.

    • 30–60%Fewer custom report requests
    • IsolatedTenant data
    • SizedCapacity cost
    View case study: Embedded Analytics in a SaaS Product
  132. White-Label Agency Delivery
    • Agency
    • White-label
    • Web & Software

    White-Label Agency Delivery

    Engagement length
    2 years 8 months
    Platform
    Web & software projects

    Nearly three years as the delivery team behind a London agency — their clients, their standards, their name on the work.

    • 100%On-time delivery across the partnership
    • 40%More project capacity for the agency
    • 2 yr 8 moPartnership length

    Silver Scintilla went above and beyond as a vendor, exceeding all expectations.

    Tasos Maroudas, Technical Director & Founder, Coded Lines Ltd
    View case study: White-Label Agency Delivery
  133. Embedded Engineering Team
    • Staff Augmentation
    • Long-term
    • Austin
    • TX

    Embedded Engineering Team

    Engagement length
    5+ years, ongoing
    Platform
    The client's own stack

    Five years and counting as embedded engineers for an Austin software consultancy — our longest running client relationship.

    • 5 yrsAnd counting, with the same client
    • 100%Engineer retention on the engagement
    • 3xGrowth in embedded team size

    Their honesty, seamless engagement, talented resources, and affordable rates make them an ideal partner.

    Charles Martin, Co-Founder, Flux Bucket LLC
    View case study: Embedded Engineering Team
  134. SaaS
    • .NET
    • Embedded team

    .NET Team for a SaaS Platform

    Industry
    SaaS
    Timeline
    2–4 weeks to start

    Dedicated .NET developers who join your SaaS team, work in your process and deliver in your sprints.

    • 2–4 weeksFrom agreement to first sprint
    • Sprint 2–3Contributing at full pace
    • Your metricsDelivery measured your way
    View case study: .NET Team for a SaaS Platform
  135. ERP Team
    • Dynamics 365
    • Embedded team

    Dynamics Developers for In-House IT

    Industry
    Manufacturing IT
    Timeline
    2–4 weeks to start

    Business Central or F&O developers who join the IT team and work through the Dynamics backlog.

    • 2–4 weeksTo the first delivered enhancement
    • SteadyBacklog reduction
    • Kept currentMicrosoft updates
    View case study: Dynamics Developers for In-House IT
  136. Fintech
    • QA automation
    • Embedded team

    QA Automation Squad for Fintech

    Industry
    Fintech
    Timeline
    2–3 weeks to start

    QA automation engineers who build regression suites in CI so a fintech team releases faster and safer.

    • 50–80%Less manual regression time
    • More frequentReleases
    • FewerEscaped defects
    View case study: QA Automation Squad for Fintech
  137. Agency
    • React
    • White-label

    React and Node Developers for Agencies

    Industry
    Digital agencies
    Timeline
    1–3 weeks to start

    White-label React and Node.js developers who join an agency's projects when demand peaks.

    • 1–3 weeksTo add developers to a project
    • FlexibleTeam size across projects
    • Agency-ledClient relationship
    View case study: React and Node Developers for Agencies
  138. Data Platform
    • Azure
    • Embedded team

    Data Engineers for an Azure Migration

    Industry
    Data platforms
    Timeline
    2–4 weeks to start

    Data engineers who migrate pipelines to Azure or Fabric alongside your team and leave the knowledge behind.

    • ParallelMigration and business-as-usual
    • ValidatedEvery migrated pipeline
    • DocumentedNew platform
    View case study: Data Engineers for an Azure Migration
  139. Cloud Platform Engineering Team
    • Cloud
    • Platform
    • Embedded team

    Cloud Platform Engineering Team

    Engagement length
    4+ years, ongoing
    Platform
    Cloud infrastructure

    Engineers embedded in a Copenhagen cloud platform team for more than four years — platform work, deployment tooling and the reliability behind it.

    • 4 yrsAnd still shipping together
    • 3xIncrease in deployment frequency
    • 99.9%Platform availability maintained

    Their talent and agility as developers are exceptional.

    Hemen Showkati, Co-Founder & CEO, Doprax
    View case study: Cloud Platform Engineering Team
  140. Insurance
    • Azure
    • Cloud migration

    On-Premises to Azure Migration

    Industry
    Insurance
    Timeline
    4–9 months

    On-premises applications moved to Azure in rehearsed waves, on a secure landing zone with tested recovery.

    • 15–30%Lower infrastructure run cost targeted
    • ZeroHardware refreshes ahead
    • TestedRecovery for every application
    View case study: On-Premises to Azure Migration
  141. Product Team
    • DevOps
    • Infrastructure as code

    CI/CD and Infrastructure as Code

    Industry
    Software product teams
    Timeline
    8–14 weeks

    Automated build, test and deployment pipelines with environments defined as code and fast rollbacks.

    • Daily or betterDeployment frequency
    • MinutesTo roll back
    • MinutesTo create an environment
    View case study: CI/CD and Infrastructure as Code
  142. eCommerce
    • FinOps
    • Autoscaling

    Cloud Cost Optimisation for eCommerce

    Industry
    eCommerce
    Timeline
    6–10 weeks

    Right-sizing, tested autoscaling and committed-use discounts that cut cloud spend without slowing peak days.

    • 20–40%Lower monthly cloud bill targeted
    • UnchangedPeak-day performance
    • Per teamCost visibility
    View case study: Cloud Cost Optimisation for eCommerce
  143. Healthcare
    • SRE
    • Disaster recovery

    Reliability and Disaster Recovery

    Industry
    Healthcare
    Timeline
    10–16 weeks

    Monitoring, agreed recovery objectives, tested backups and a rehearsed second-region failover.

    • AgreedRecovery time and data loss objectives
    • TestedRestores and failover
    • FasterDetection of incidents
    View case study: Reliability and Disaster Recovery
  144. B2B Software
    • SEO
    • B2B SaaS

    SEO for a B2B SaaS Company

    Industry
    B2B software
    Timeline
    9–12 months

    Organic search rebuilt around the pages buyers use to choose software, with results measured in demo requests and pipeline.

    • 60–120%More demo requests from organic search
    • 30–50Commercial keywords moved to page one
    • 20–35%Of new pipeline sourced from organic
    View case study: SEO for a B2B SaaS Company
  145. Manufacturing
    • SEO
    • Migration

    SEO-Safe Website Migration

    Industry
    Industrial manufacturing
    Timeline
    12–16 weeks

    A manufacturer's fifteen-year-old website moved to a new platform without losing the rankings its enquiries depend on.

    • 95–100%Of organic traffic retained through launch
    • 100%Of ranking URLs mapped and redirected
    • 15–30%Faster page loading
    View case study: SEO-Safe Website Migration
  146. Publishing
    • Technical SEO
    • Core Web Vitals

    Core Web Vitals for a Publisher

    Industry
    Online publishing
    Timeline
    10–14 weeks

    Speed, layout stability and crawl efficiency fixed at template level for a publisher, without reducing advertising income.

    • 90%+Of pages passing Core Web Vitals
    • 25–45%More organic and Discover traffic
    • MinutesFrom publishing to indexing
    View case study: Core Web Vitals for a Publisher
  147. Property
    • Technical SEO
    • Next.js

    JavaScript SEO for a Property Marketplace

    Industry
    Property marketplace
    Timeline
    12–18 weeks

    A React property marketplace made fully indexable, with listings, locations and filter pages under control.

    • 90%+Of live listings indexed
    • 40–80%More organic visits to listing and location pages
    • Days → hoursFor a new listing to appear in search
    View case study: JavaScript SEO for a Property Marketplace
  148. Healthcare
    • Local SEO
    • Google Business Profile

    Local SEO for a Dental Group

    Industry
    Dental clinics
    Timeline
    6–9 months

    Every clinic in a dental group made visible for nearby searches, with calls and bookings tracked per location.

    • 50–90%More calls and bookings from Google Maps
    • Top 3In the map results for core treatments
    • 2–4×More new reviews each month
    View case study: Local SEO for a Dental Group
  149. Restaurants
    • Local SEO
    • Direct bookings

    Local SEO for a Restaurant Group

    Industry
    Restaurants
    Timeline
    4–6 months

    Each restaurant made the first result for its own name and area, moving bookings from commission platforms to direct.

    • 30–60%More direct bookings
    • 15–30%Less commission paid to platforms
    • 4.5+Average review rating maintained
    View case study: Local SEO for a Restaurant Group
  150. Online Retail
    • eCommerce SEO
    • Magento

    eCommerce SEO for a Large Catalogue

    Industry
    Online retail
    Timeline
    6–9 months

    Index bloat cleared and category pages rebuilt for a retailer with a large catalogue, measured in organic revenue.

    • 35–70%More organic revenue
    • 60–80%Fewer low-value URLs in the index
    • 25–40%More category pages on page one
    View case study: eCommerce SEO for a Large Catalogue
  151. Health & Beauty
    • eCommerce SEO
    • Shopify

    Shopify SEO for a Skincare Brand

    Industry
    Health & beauty
    Timeline
    6–9 months

    Organic visibility built for skin concerns and ingredients, giving a skincare brand new customers beyond paid social.

    • 80–150%More non-brand organic traffic
    • 30–55%More organic revenue
    • 10–20%Lower share of revenue from paid social
    View case study: Shopify SEO for a Skincare Brand
  152. Manufacturing
    • PPC
    • Google Ads

    B2B Paid Search Measured in Revenue

    Industry
    Industrial equipment
    Timeline
    12–16 weeks

    Google Ads rebuilt for a manufacturer around qualified enquiries and orders, with the CRM connected to the account.

    • 30–50%Lower cost per qualified enquiry
    • 2–3×Return on advertising spend
    • 40–60%Fewer unqualified form submissions
    View case study: B2B Paid Search Measured in Revenue
  153. Hotels
    • PPC
    • Hotel ads

    Paid Search for Direct Hotel Bookings

    Industry
    Hotels
    Timeline
    8–12 weeks

    Paid search and hotel ads that bring a hotel group's bookings direct, measured on revenue after commission.

    • 20–40%More direct booking revenue
    • 8–12×Return on advertising spend
    • 5–10 ptsHigher share of bookings made direct
    View case study: Paid Search for Direct Hotel Bookings
  154. Fintech
    • Content marketing
    • SEO

    Content Marketing for a Fintech

    Industry
    Fintech
    Timeline
    6–9 months

    A content programme written with a fintech's own experts and approved by compliance in days, measured in sign-ups.

    • 50–100%More organic traffic to guides and documentation
    • 25–45%More sign-ups that began with content
    • 5 daysFrom draft to compliance approval
    View case study: Content Marketing for a Fintech
  155. Education
    • Content marketing
    • SEO

    Content and SEO for a Course Provider

    Industry
    Online education
    Timeline
    6–9 months

    Course pages rebuilt and career guides added, so applicants find an online course provider through search and enrol informed.

    • 40–80%More organic enquiries
    • 20–35%Lower cost per enrolment
    • 15–25%Higher enquiry-to-enrolment rate
    View case study: Content and SEO for a Course Provider
  156. Professional Services
    • Social media
    • LinkedIn

    LinkedIn for an Engineering Consultancy

    Industry
    Engineering consultancy
    Timeline
    6–12 months

    A consultancy's experts kept in front of a named list of target accounts on LinkedIn, measured in conversations with those accounts.

    • 60–80%Of target accounts reached each quarter
    • 2–3×More inbound conversations from target accounts
    • 8–12Experts posting regularly
    View case study: LinkedIn for an Engineering Consultancy
  157. Fitness
    • Paid social
    • Meta Ads

    Paid Social for a Gym Chain

    Industry
    Fitness clubs
    Timeline
    8–12 weeks

    Paid social run club by club for a gym chain, with local creative and spend judged on memberships sold.

    • 25–45%Lower cost per new member
    • 30–60%More trial sign-ups from social
    • 40–55%Of trials converted to membership
    View case study: Paid Social for a Gym Chain
  158. Food & Drink
    • Email marketing
    • Klaviyo

    Email Automation for a Subscription Brand

    Industry
    Food & drink subscriptions
    Timeline
    8–12 weeks

    Lifecycle email built on a coffee subscription brand's own data, with each flow measured against a holdout group.

    • 25–40%Of email revenue from automated flows
    • 10–20%Lower subscription churn
    • 15–30%More first-time buyers converting to a subscription
    View case study: Email Automation for a Subscription Brand
  159. Property
    • Marketing automation
    • HubSpot

    Lead Nurturing for a Property Developer

    Industry
    Property development
    Timeline
    10–14 weeks

    Enquiries followed up automatically by development, buyer type and stage, with sales alerted when a buyer is ready.

    • 30–50%More enquiries converted to viewings
    • MinutesTo the first response
    • 20–35%Less sales time on unready enquiries
    View case study: Lead Nurturing for a Property Developer
  • 725+Projects shipped
  • 19+Industries served
  • 27Verified Clutch reviews
  • 5.0Average rating

Client reviews

What clients say about the results

Verified reviews from Clutch.

5.0 27 verified reviews

Free discovery call

Have an idea? Let's turn it into AI-powered software.

Book a free discovery call with our experts. Share your idea and we will help you shape the scope, timeline and budget, under NDA.

  • Free consultation
  • NDA before we talk
  • Transparent estimate